The Center for AI & Roboticsfor the Built Environment

Facility & technology

50,000 SF of classrooms, studios and a high-bay robotics lab

A three-story volumetric modular building beside a 25′+ clear-height lab for robotic framing, 3D concrete printing, CNC fabrication and materials testing.

A 50,000 SF building that is itself a demonstration

The Center is built with the volumetric modules it teaches: a three-story modular building for classrooms and studios, beside a single-story high-bay lab for the heavy equipment.

Total
~50,320 SF
Footprint
~23,400 SF
Site
~1.5–2 acres
Budget
~$20.9M (~$416/SF all-in)
Facility massing concept: 3-story modular building + high-bay lab(concept rendering)

Modular building · ~40,320 SF

~60' × 224', 3 stories, ~12' floor-to-floor. 48 modules (~14' × 60'), 16 per floor. Classrooms, design studios, XR/VR lab, GPU cluster, offices.

High-bay lab · ~10,000 SF

~80' × 125', 25'+ clear height (~32–35' to roof). Robotic framing, 3D concrete printing, CNC, materials testing, bridge crane.

Ground-floor footprint

To scale. Each bay is one 14′ × 60′ module; three floors of 16 make the 48-module building.

Modular classroom building224′ × 60′ · 16 modules per floor · 3 floors · ~40,320 SFHigh-bay lab125′ × 80′ · 25′+ clear · ~10,000 SFShowcase windowMain entry & lobbyLoading dock~349′ overall · ~23,400 SF footprint

Inside the high-bay lab

Select a zone. The plan is drawn to scale at 80′ × 125′.

Robotic framing cell1,800 SF3D concrete printer1,600 SFCNC router & panel saw800 SFMaterials testing lab1,000 SFCobot & QC stations600 SFStaging & mock-up assembly4,200 SF125′-0″ · bridge crane full length

Why the lab sits beside the building, not under it

High bay3 floors of modulesClear span, crane

Recommended

~23,400 SF footprint

  • Nothing overhead: the bridge crane runs the full 125', and the printer gantry works without transfer beams
  • 80' column-free span lets equipment move as programs change
  • CNC, concrete pumping and crane loads stay off the classroom structure
  • High bay can be extended later for a manufacturing line

Conceptual planning figures from the Facility Concept (Oct. 4, 2026). Final design, dimensions and costs are subject to architect and manufacturer confirmation.

The technology in use

  • Volumetric modules arrive finished and are craned into place(concept rendering)
  • VMC for civic buildings: a K-12 classroom wing(concept rendering)
  • VMC for civic buildings: a public library(concept rendering)
  • Multi-story 3D-printed concrete construction(concept rendering)
  • 3D-printed attainable townhomes(concept rendering)
  • Printing the walls of a single-family home(concept rendering)
  • Robotics and drones carried from the lab to the job site(concept rendering)
  • Development intelligence: digital twins of live projects(concept rendering)
  • AI-driven operations after move-in(concept rendering)